濟(jì)南鐵藝大門(mén)的施工預(yù)備與關(guān)鍵

來(lái)源:http://m.nsjsw.cn 日期:2021-05-06 發(fā)布人: 瀏覽次數(shù):18
現(xiàn)在市面上做濟(jì)南鐵藝大門(mén)制造廠(chǎng)家越來(lái)越多了,特別是鐵藝配套、鐵藝院子大門(mén)等。這是由于大家的安 全防備意識(shí)越來(lái)越高了。其實(shí)濟(jì)南鐵藝大門(mén)已經(jīng)有著悠久的歷史了,鐵藝材料和工藝的發(fā)展也有著兩千多年的發(fā)展過(guò)程。
Now there are more and more manufacturers of Jinan Tieyi gate, especially Tieyi supporting facilities and Tieyi courtyard gate. This is due to the increasing awareness of security. In fact, Jinan iron gate has a long history, the development of iron materials and technology also has more than 2000 years of development process.
可是網(wǎng)絡(luò)上關(guān)于濟(jì)南鐵藝大門(mén)的施工方案的介紹和文章并不是許多,可以說(shuō)少之又少。那么現(xiàn)在詳細(xì)介紹以下濟(jì)南鐵藝大門(mén)的施工方案。
However, there are not many introductions and articles about the construction scheme of Jinan Tieyi gate on the Internet. Now, the construction scheme of Jinan Tieyi gate is introduced in detail.
1、施工預(yù)備:
1. Construction preparation:
制造好的濟(jì)南鐵藝大門(mén)進(jìn)場(chǎng)時(shí)要有出廠(chǎng)合格證和試驗(yàn)報(bào)告,其標(biāo)準(zhǔn)、類(lèi)型、尺寸均應(yīng)契合設(shè)計(jì)要求。
The manufactured Jinan Tieyi gate shall have factory certificate and test report when entering the site, and its standard, type and size shall meet the design requirements.
彈好濟(jì)南鐵藝大門(mén)方位線(xiàn),并依據(jù)1250px水平線(xiàn),確定好裝置標(biāo)高。
Snap the azimuth line of Jinan Tieyi gate, and determine the elevation of the device according to the 1250px horizontal line.
2、施工關(guān)鍵:
2. Key to construction:
濟(jì)南鐵藝大門(mén)的洞口處理:
The opening treatment of Jinan Iron Gate:
鐵藝裝置選用預(yù)留洞口后塞口的裝置辦法。鐵藝洞口的水平方位應(yīng)以墻體1250px線(xiàn)為標(biāo)準(zhǔn),往上返,量出窗下皮標(biāo)高,彈線(xiàn)找直。為確保各層窗口上下通線(xiàn),選用經(jīng)緯儀將兩側(cè)直線(xiàn)打在墻上。塑鋼鐵藝框與墻體的間隙每側(cè)留10-15mm。
The method of plugging the hole after reserving the hole is selected for the ironwork device. The horizontal orientation of the iron hole should be based on the 1250p X-ray of the wall. Turn up, measure the elevation of the lower skin of the window, and snap the line to make it straight. In order to ensure that the upper and lower lines of the windows on each floor are connected, the theodolite is selected to mark the straight lines on both sides on the wall. The gap between the plastic steel iron frame and the wall shall be 10-15mm on each side.
濟(jì)南鐵藝大門(mén)門(mén)框用固定鐵件與墻體連接。即用自攻螺釘將鐵件裝置在窗框外側(cè)投足槽內(nèi),再將濟(jì)南鐵藝大門(mén)門(mén)框送入洞口定位,定位處穿過(guò)鐵件預(yù)留孔,在墻體相對(duì)位對(duì)上鉆洞并插入脹管,擰緊脹管螺釘將鐵件與墻體固定。
The door frame of Jinan iron gate is connected with the wall with fixed iron parts. The self tapping screw is used to put the iron part into the foot slot outside the window frame, and then the door frame of Jinan Tieyi gate is put into the hole for positioning. The positioning position passes through the reserved hole of iron part, and the hole is drilled in the opposite position of the wall, and the expansion pipe is inserted, and the expansion screw is tightened to fix the iron part and the wall.