鐵藝護(hù)欄常規(guī)的安裝方式分為什么?
來(lái)源:http://m.nsjsw.cn 日期:2023-05-25 發(fā)布人: 瀏覽次數(shù):8次
鐵藝護(hù)欄在廠家制作完成后,還要經(jīng)過(guò)裝卸運(yùn)輸過(guò)程到工地,然后再進(jìn)行安裝。
After the iron guardrail is manufactured by the manufacturer, it needs to go through the process of loading, unloading, and transportation to the construction site before installation.
運(yùn)輸裝卸:濟(jì)南鐵藝護(hù)欄出廠之前要做好包裝,起碼要把護(hù)欄的高點(diǎn)包裝一下,如:護(hù)欄的立柱以及大的橫管,中間的小管因?yàn)楸却蠊馨?,一般情況下磨不著,所以不用包裝。
Transportation and loading and unloading: Firstly, before leaving the factory, Jinan Iron Art Guardrail should be well packaged. At least, the high points of the guardrail should be packaged, such as the columns of the guardrail and the large horizontal pipes. The small pipes in the middle cannot be ground because they are shorter than the large pipes, so packaging is not necessary.
如果一點(diǎn)都不包裝的話,裝卸過(guò)程以及運(yùn)輸過(guò)程很容易磨損,還要安裝過(guò)程再磨損漆面的話,安裝完之后漆面就非常難看了,工程的話很可能驗(yàn)收不過(guò),切記包裝很關(guān)鍵,俗話說(shuō)貨賣一張皮,就算不包裝也沒(méi)問(wèn)題的話,包裝一下也能提高產(chǎn)品的檔次。
If there is no packaging at all, the loading and unloading process and transportation process are prone to wear and tear. If the paint surface needs to be worn during the installation process, it will be very unsightly after installation. If the project is not accepted, remember that packaging is crucial. As the saying goes, selling a piece of leather is not a problem, and packaging can also improve the quality of the product.
然后再就是安裝,確定好安裝方式,常規(guī)的安裝方式分為:
Then there is the installation, determining the installation method. The conventional installation methods are divided into:
1:法蘭盤固定也就是打膨脹螺栓固定,這種方式需要的工具有:沖擊電錘、膨脹螺栓、鐵錘、扳手、螺絲刀、卷尺等等,需要注意水泥地面平整度,緊膨脹螺栓的時(shí)候注意調(diào)整立柱的垂直度。
1: Fixing the flange plate is also known as fixing with expansion bolts. This method requires tools such as impact hammers, expansion bolts, hammers, wrenches, screwdrivers, tape measures, etc. It is necessary to pay attention to the flatness of the cement floor and adjust the verticality of the column when tightening the expansion bolts.
2:加長(zhǎng)腿預(yù)埋也就是立柱挖坑澆筑,這種方式需要的工具有:水泥、沙子、石子等攪拌工具,小推車等運(yùn)輸工具。需要注意在澆筑混泥土?xí)r候好用石頭或者磚塊先把立柱固定住然后再澆灌混凝土,只用混凝土剛開(kāi)始容易移動(dòng)位置。
2: Long leg pre embedding, also known as column excavation and pouring, requires tools such as mixing tools such as cement, sand, and stones, as well as transportation tools such as small carts. It should be noted that when pouring concrete, it is better to use stones or bricks to fix the column first and then pour concrete, only using the position where the concrete is easy to move at the beginning.
3:下預(yù)埋鐵焊接固定,這種方式需要提前下裝預(yù)埋鐵,安裝的時(shí)候立柱或者橫管直接焊接到預(yù)埋貼上,這樣要要求預(yù)埋鐵的尺寸和護(hù)欄的尺寸要高度一致,這種安裝速度是快的,不過(guò)這種安裝方式多少的會(huì)破壞漆面,需要把破壞的漆面打磨再上漆。
3: The lower embedded iron is welded and fixed. This method requires the installation of the embedded iron in advance. During installation, the column or horizontal pipe is directly welded to the embedded adhesive. This requires the size of the embedded iron and the size of the guardrail to be consistent in height. This installation speed is fast, but this installation method can damage the paint surface to some extent, and the damaged paint surface needs to be polished before painting.
這幾種安裝方式各有各的好處,根據(jù)實(shí)際情況來(lái)選擇。注意調(diào)整好護(hù)欄的整體高度一致以及安裝好的護(hù)欄在一條線上。更多相關(guān)內(nèi)容就來(lái)我們網(wǎng)站http://m.nsjsw.cn咨詢了解吧!
These installation methods each have their own advantages, and should be chosen according to the actual situation. Pay attention to adjusting the overall height of the guardrail to be consistent and the installed guardrail to be in line. For more related content, come to our website http://m.nsjsw.cn Consult and understand!